Engineering Disasters
By: Steve • Essay • 725 Words • December 28, 2009 • 987 Views
Join now to read essay Engineering Disasters
On February 1, 2003, the Space Shuttle Columbia was lost due to structural failure in the left wing. On take-off, it was reported that a piece of foam insulation surrounding the shuttle fleet's 15-story external fuel tanks fell off of Columbia's tank and struck the shuttle's left wing. Extremely hot gas entered the front of Columbia's left wing just 16 seconds after the orbiter penetrated the hottest part of Earth's atmosphere on re-entry. The shuttle was equipped with hundreds of temperature sensors positioned at strategic locations. The salvaged flight recorded revealed that temperatures started to rise in the left wing leading edge a full minute before any trouble on the shuttle was noted. With a damaged left wing, Columbia started to drag left. The ships' flight control computers fought a losing battle trying to keep Columbia's nose pointed forward.
It’s very hard to say what steps, if any, could have been taken to prevent the Space Shuttle Columbia disaster from occurring. When mankind continues to “push the envelope” in the interest of bettering humanity, there will always be risks. In the manned spaceflight business, we have always had to live with trade-offs. All programs do not carry equal risk nor do they offer the same benefits. The acceptable risk for a given program or operation should be worth the potential benefits to be gained. The goal should be a management system that puts safety first, but not safety at any price. As of Sept 7th, 2003, NASA has ordered extensive factory inspections of wing panels between flights that could add as much as three months to the time it takes to prepare a space shuttle orbiter for launch. NASA does all it can to safely bring its astronauts back to earth, but as stated earlier, risks are expected.
On August 14th, 2003, a major blackout swept across portions of the northeastern United States and Canada. It was reported that a series of equipment outages in the Midwest led to uncontrolled cascading outages of power transmission lines and generators serving parts of the Northeast, Midwest and Canada. Automatic protective systems operated to open circuits and shut down power plants to prevent further spread of the outages. This is very similar to what happened in The Great Northeast Blackout of 1965. In both situations, the “grid system” shut down one generator in line at a time to protect a surge from the station before it. The outage had a huge impact on New York City, which relies heavily on electric power. Most New Yorkers commute