EssaysForStudent.com - Free Essays, Term Papers & Book Notes
Search

Slaughterhouse Industry

By:   •  Case Study  •  2,735 Words  •  December 3, 2009  •  1,498 Views

Page 1 of 11

Essay title: Slaughterhouse Industry

TABLE OF CONTENTS

Introduction

Industry Study

Project Description

A. Basic Project Information

B. Project Location

C. Project Rationale

D. Alternative

E. Description of Project Phases

F. Baseline Environment Condition

G. Impact Assessment and Mitigation

H. Environment Management Plan

I. Proposal for an Environmental Monitoring and Guarantee Fund

Attachment of Annexes

A. Photos or Plates of Proposed Project

B. Impact Areas, Affected and Communities

C. Maps of the following Scale

D. Permit to Operate Certificate

E. E. Result of Physical and Chemical Analysis of Water and Wastewater

PROJECT DESCRIPTION

Davao City slaughterhouse is located at Ma-a, Davao City. The operations are limited to the night shift. The delivery of animals will start at 1:00 to 4:30 in the afternoon. The whole morning will be utilized for cleaning the area. The 2nd shift will start at 9:00 in the evening up to 5:30 in the morning.

It employs 48 workers of which 25 are regulars and 23 are contractual. This contractual will do the maintenance and the manual slaughtering of animals.

Currently the number of hogs, cattles and other animals slaughtered are as follows

Hogs 200 to 250 heads

Cattle 30 to 40 heads

Chicken none ( chicken slaughterhouse is out of order)

Goat 20 to 25 heads

The number of heads slaughtered everyday does not level of with the number of kilos meat sold in the public market. In short there are hogs and cattle slaughtered privately.

The following are the charges per head for the service rendered:

Hogs P91.11 per head

Cattle P152 per head

Goat P40.00 per head

There are two stockyards presently existing in the city slaughterhouse. One is for the hogs and the other is for the large cattle. Three operational ponds are present in the slaughterhouse, the aerobic pond, anaerobic pond, and the facultative pond. And sludge drying bed.

As what we have observed there are two ways of acquiring water for use of slaughtering and maintenance of the slaughterhouse. One is the metered water system direct from the meter to the faucet and the use of water reservoir. Two large overhead tanks are place serve as water reservoir use for slaughtering and the metered water system is for office consumption.

A. Basic Project Information

Project Name: Davao City Slaughterhouse

Address: Ma-a Davao City

Contact Person: Ariel Cascabel

Officer in charge

The number of hogs and cattle slaughtered for the year 2004 dropped compared to past years due to the economic crisis.

Ma-a slaughterhouse operation generally involves the following:

a. Lairage

b. Bath

c. Stunning

d. Hoisting

e. Bleeding

f. Scalding

g. Dehairing

h. Gambrelling

i. Final Scrapping

j. Evisceration

k. Inspection

l. Splitting

m. Weighing

n. To

Download as (for upgraded members)  txt (19.3 Kb)   pdf (273.2 Kb)   docx (21 Kb)  
Continue for 10 more pages »