EssaysForStudent.com - Free Essays, Term Papers & Book Notes
Search

Work

By:   •  Essay  •  484 Words  •  March 28, 2010  •  885 Views

Page 1 of 2

Work

Fig 2.1 shows different stages in the system's life cycle. It initiates with a project request. First stage is the preliminary analysis. The main aim of preliminary analysis is to identify the problem. First, need for the new or the enhanced system is established. Only after the recognition of need, for the proposed system is done then further analysis is possible.

Suppose in an office all leave-applications are processed manually. Now this company is recruiting many new people every year. So the number of employee in the company has increased. So manual processing of leave application is becoming very difficult. So the management is considering the option of automating the leave processing system. If this is the case, then the system analyst would need to investigate the existing system, find the limitations present, and finally evaluate whether automating the system would help the organization.

Once the initial investigation is done and the need for new or improved system is established, all possible alternate solutions are chalked out. All these systems are known as "candidate systems". All the candidate systems are then weighed and the best alternative of all these is selected as the solution system, which is termed as the "proposed system". The proposed system is evaluated for its feasibility. Feasibility for a system means whether it is practical and beneficial to build that system.

Feasibility is evaluated from developer and customer's point of view. Developer sees whether they have the required technology or manpower to build the new system. Is building the new system really going to benefit the customer. Does the customer have the required money to build that type of a system? All these issues are covered in the feasibility study of the

system. The feasibility of the system is evaluated on the three main issues: technical, economical, and operational. Another issue in this regard is the legal feasibility of the project.

Download as (for upgraded members)  txt (3.1 Kb)   pdf (60.5 Kb)   docx (11 Kb)  
Continue for 1 more page »